Horizontal Directional Drilling
|
In order to overcome longer obstacles than in case horizontal drilling, the use of horizontal directional drilling In this case the pipe diameters are usually no larger than 56"(1422 mm), and the length of the drill pass can be up to 5 kilometers. |
|
The horizontal directional drilling procedure consists of the following: |
||
![]() |
1. A narrow tunnel with the required trajectory is created Drill auger position is controlled constantly and operator any moment can correct deviation. |
|
|
pilot borehole drilling |
||
![]() |
2. A special reamer is fitted on With the help of pressurized water, the reamer that is attached to the pipe widens the tunnel until the necessary diameter is achieved. |
|
|
borehole reaming |
||
![]() |
3. The flexible rod begins to travel in the opposite direction while pulling the pipe. This way the pipe is pulled through the entire tunnel that was created earlier. |
|
|
pipeline pulling |
||
![]() |
Pulling of pipe through the tunnel can create This problem is solved by applying Ceramguard to the pipe. When three-layer coating is used, the joints |
![]() |
||
|
pipe with reamer |
after travelling |